A milestone-by-milestone walk through a contracted CubeSat build, from PDR and CDR to integration, test, and delivery.

A built-to-order CubeSat moves through a sequence of review gates that exist to catch problems while they are still cheap to fix. If you are contracting a custom build for the first time, knowing what happens at each gate, and what you should expect to see or approve, keeps you an informed participant instead of a passive customer waiting for a delivery date.

Kickoff and Requirements Definition

The program starts with a requirements review, where your mission objectives get translated into specific, testable engineering requirements: pointing accuracy in arcminutes, data downlink volume per day, power budget in watts, orbit and launch vehicle constraints. This is the most important meeting in the entire program, because every later review measures the design against whatever gets written down here. Specific numbers tend to serve better than general goals. A requirement that says the payload needs reliable power is not testable. A requirement that says the payload needs 12 watts average and 20 watts peak with less than 5 percent ripple is.

Preliminary Design Review

The Preliminary Design Review, PDR, typically happens 4 to 8 weeks after kickoff on a compressed CubeSat schedule. At PDR, the manufacturer presents the baseline architecture: subsystem block diagrams, a preliminary power budget, a mass budget with margin, and the overall mechanical layout. This is the point where a custom bus trigger, discovered after requirements review, gets formally baselined into the design. PDR is a good opportunity to confirm the architecture actually addresses your mission requirements and to flag anything that looks underspecified before detailed design work begins, since changes after PDR cost more in both schedule and dollars.

Critical Design Review

Critical Design Review, CDR, comes after detailed design is largely complete, often 10 to 16 weeks into the program depending on complexity. At CDR, it is reasonable to expect detailed schematics, a thermal analysis showing margin across the expected orbit environment, a structural analysis covering launch loads, and a test plan for the hardware that is about to be built. CDR is the last practical point to catch a design issue before parts are procured and assembly begins. On Blackwing Space's Baby Bird program, a five-month contract-to-launch cycle, PDR and CDR were compressed relative to a traditional aerospace timeline specifically because the Sparrow 1.5U bus architecture was already flight-proven, which left detailed design time for the three customer payload interfaces instead of the bus itself.

Integration and Assembly

Once CDR closes, long-lead parts get procured and subsystem-level assembly begins in parallel: flight computer and avionics, structure and mechanisms, power system, and payload interface. Integration is where these subsystems come together into a single spacecraft. A defined integration schedule with named milestones, avionics bring-up, power system verification, payload interface checkout, is worth asking for rather than a single block labeled integration on a Gantt chart. A vague integration schedule is the most common place a CubeSat program loses weeks without anyone noticing until it is too late.

Qualification Testing

Before delivery, a built-to-order spacecraft goes through environmental qualification testing: vibration testing to simulate launch loads, thermal vacuum cycling to simulate the orbital thermal environment, and functional testing of every subsystem under those conditions. This phase typically runs 3 to 6 weeks. Seeing the test plan before testing starts, not just the results afterward, is helpful so you know what pass criteria are being used. A spacecraft that passes a weak test plan is not actually qualified, regardless of what the final report says.

Delivery and Launch Integration

Final delivery usually means the manufacturer hands off the spacecraft, or ships it directly, to a launch integrator or rideshare provider, along with a data package covering as-built configuration, test results, and operating procedures. It is sensible to confirm well before this point who is responsible for launch vehicle integration paperwork and licensing, since this is a common gap between a manufacturer's scope of work and what you actually need to get to orbit.

Staying Involved Without Slowing the Program Down

The most effective customers on a built-to-order program show up fully at PDR and CDR, respond to change-order requests within days rather than weeks, and otherwise let the manufacturer's team execute. Reviewing every internal engineering decision in between review gates rarely improves the outcome and reliably adds schedule risk, since it pulls engineering time away from building toward the next milestone.

Tags: CubeSat Built to Order Design Build Process PDR CDR Qualification Testing Spacecraft Integration
Blackwing Space

Blackwing Space Team

Making space accessible with commercial, American-made nanosatellites. Building affordable, modular platforms for the next generation of Space 3.0 innovation.

Contact Us